Can I change the UoM group in the material master?
- In SAP ECC systems, you cannot change the UoM group or add or delete UoM to an existing UoM group, once stock has been posted for such a material.
- In SAP S/4HANA systems, a UoM group that is assigned to a material can be extended with a new UoM, also in production. However, this requires usage of a dedicated extension report tool provided by SAP – Read SAP Note 2328459 for details. Thus, such a UoM group extension (adding a new UoM to an existing UoM group) should always be performed by an experienced HPM consultant.
The UoM Group itself cannot be removed from or changed for a material, once stock has been posted!
Read the FAQ for a conversion group change for more information.
Categories: SAP QCI General Configuration FAQs
Back to FAQs